隔音砂漿施工程序
Construction procedure of sound insulation mortar
1、樓板表麵應潔淨牢固,清除樓板表麵的灰塵、油脂、顆粒等一切影響粘結性能的鬆散物後可直接施工。
1. The floor surface shall be clean and firm, and the construction can be carried out directly after the dust, grease, particles and other loose matters affecting the bonding performance on the floor surface are removed.
2、減振隔聲砂漿攪拌:采用機械攪拌,將水與減振隔聲砂漿放入攪拌機中進行攪拌;投料順序依次為隔聲砂漿、水;攪拌總時間以隔聲砂漿攪拌均勻為止,不少於2min而不多於5min。隔聲砂漿成品以水灰比1:4為準。
2. Mixing of vibration damping and sound insulation mortar: mechanical mixing is adopted, and water and vibration damping and sound insulation mortar are put into the mixer for mixing; the feeding order is sound insulation mortar and water; the total mixing time is not less than 2min but not more than 5min until the sound insulation mortar is evenly mixed. The finished sound insulation mortar shall be subject to the water cement ratio of 1:4.
隔音砂漿施工
3、減振隔聲砂漿應隨用隨拌,攪拌好的減振隔聲砂漿應在3小時內使用完成(夏天氣溫高時2小時內使用完成)。取出後直接倒在樓板地麵上並抹平,如遇管道等產生局部過薄處,必須采取防裂措施,厚度應符合設計要求或處不小於20mm,符合設計要求後方可施工。

3. The vibration and sound insulation mortar should be mixed as soon as it is used, and the mixed vibration and sound insulation mortar should be used within 3 hours (2 hours when the temperature is high in summer). After being taken out, it shall be directly poured on the floor and smoothed. In case of local thin place caused by pipes, crack prevention measures must be taken. The thickness shall meet the design requirements or the place shall not be less than 20 mm. Construction can be started only after meeting the design requirements.
隔音砂漿施工工序 皇冠AG真人綠建
4、壓光:在壓平頭遍後,減振隔聲砂漿地麵凝結至人踩上去,有腳印但不陷下去時,用木抹子搓平壓實,然後用鐵抹子壓第二遍。要求不漏壓,表麵平麵出光。壓平、壓實、壓光,達到交活的程度。壓光應在終凝前完成。

4. Calendering: after the first pass of calendering, the vibration damping and sound insulation mortar ground is condensed until people step on it. When there are footprints but it does not sink, it is rubbed and compacted with a wooden trowel, and then pressed with an iron trowel for the second pass. It is required that there is no pressure leakage and the surface is smooth. Flatten, compact and polish to reach the level of interaction. Calendering shall be completed before final setting.
5、隔聲砂漿施工完成後24小時,直接灑水養護,養護時間不少於7天。
5. After the construction, the curing time shall not be less than 7 hours.


—(皇冠AG真人綠建)隔音砂漿項目案例:
- (Huayang Lvjian) sound insulation mortar project case:
1、恒大外灘花園項目【廣東湛江】
1. Evergrande Bund Garden Project [Zhanjiang, Guangdong]
2、龍岐村棚改回遷商品房項目19-04地塊【海南海口】
2. Plot 19-04 of Longqi Village commercial housing project
3、龍光玖龍湖北湖花園項目【廣東肇慶】
3. Longguang Jiulong Lake North Lake Garden Project [Zhaoqing, Guangdong]
4、廣西南寧錢隆公館【廣西南寧】

4. Qianlong residence in Nanning, Guangxi [Nanning, Guangxi]
5、南沙萬國十四期B項目【廣州南沙】
5. Nansha Wanguo phase 14 B project [Guangzhou Nansha]
6、深圳碧桂園觀麓花園項目【深圳龍崗】
6. Shenzhen country garden Guanlu garden project [Shenzhen Longgang]
更多砂漿材料相關資訊
1、皇冠AG真人隔音砂漿檢測報告
2、樓麵隔音砂漿施工要求
3、建築樓地麵隔音砂漿施工要點
4、隔音塗料檢驗引用標準及性能指標,施工規格
5、皇冠AG真人綠建隔音砂漿蘇州展會
6、
廣東隔音塗料-HY-T1
7、玻化微珠保溫砂漿保溫性能和優勢
8、
抗裂砂漿施工工藝及注意事項
9、
無機保溫砂漿檢測報告
10、隔音砂漿|隔音塗料|隔音墊